UNITED ARAB EMIRATESDUBAI, UAE · ACROSS THE GCC

Generator Rental across the UAE

Engineering and sales in Dubai, equipment in KIZAD, Abu Dhabi. High-capacity 1,250 kVA modules and complete temporary power plants for sites from Dubai to the islands offshore Abu Dhabi.

SINTAQA rental generator container transported on a trailer in the UAE
SINTAQA / UAE
Office: Metropolis Tower, Business Bay
Dubai
Equipment yard, Abu Dhabi
KIZAD
Among SINTAQA's vendor registrations
ADNOC · TAQA · DEWA
UAE grid; 60 Hz available for marine loads
50 Hz

Where does SINTAQA operate in the UAE?

SINTAQA's office is in Metropolis Tower, Business Bay, Dubai, and the equipment yard is in KIZAD, Abu Dhabi. Containerised generators, transformers and fuel tanks travel from the yard by trailer to sites across the UAE, including island and marine locations.

SINTAQA in the UAE
LocationRoleExamples
Dubai, Business BayHead office: engineering, sales, project managementSchool power supply in Dubai (Al Shirawi)
KIZAD, Abu DhabiEquipment yard: storage, maintenance, mobilisationFleet of new 1,250 kVA modules and fuel tanks
Abu Dhabi islandsIsland and marine deploymentsDalma Island, Hudayriat Island
Abu Dhabi utilitiesFuel storage rentalTAQA Transmission sites

What UAE requirements does a rental power plant need to meet?

Requirements depend on the site owner and the connection. Oil and gas sites under ADNOC typically require ADNOC-approved equipment and, in hazardous areas, Zone 2 certified generators; utility connections may need commissioning witnessed by an approved engineer; fuel storage needs compliant tanks.

  • ADNOC-approved generators and fuel tanks; ATEX Zone 2 units certified per unit
  • Double-wall, self-bunded fuel tanks (UL 142, Civil Defence compliant)
  • Commissioning by a TAQA-approved engineer where required, as on Dalma Island
  • 50 Hz, 400/230 V at LV; step-up to 11 kV or 33 kV through transformers where needed
Modular generator plant3 running generator modules plus 1 standby connected to a common synchronising bus, then a step-up transformer to the medium-voltage network.GG1GG2GG3GStandbySynchronising bus · LVStep-up transformerMV network, e.g. 11 kV
Typical UAE temporary plant: synchronised 1,250 kVA modules with a standby unit, stepped up to the site's MV network.

Which UAE organisations is SINTAQA registered with?

Registered with multiple major organisations across the UAE and GCC, including: ADNOC, TAQA, DEWA, Dolphin Energy, Emarat, NMDC Energy, Etihad Rail, RTA, Dubai Municipality, KEZAD, Miral, L&T, ALEC, Trojan, Target, Al Shirawi, Al Masaood, Nestlé MENA.

Generator rental in the UAE: FAQ

Where does SINTAQA deliver generators in the UAE?

Across the UAE. Equipment is mobilised by trailer from our yard in KIZAD, Abu Dhabi, including to island and marine sites. Current projects are in Dubai and Abu Dhabi, including Dalma Island and Hudayriat Island.

What voltage and frequency do UAE sites use?

The UAE grid runs at 50 Hz with a 400/230 V low-voltage supply. Marine and imported equipment may need 60 Hz, which every SINTAQA module can provide.

Is SINTAQA a registered vendor with UAE utilities and ADNOC?

Yes. SINTAQA is registered as a vendor with ADNOC, TAQA, DEWA and other major organisations. Separately, ADNOC-approved generator units, fuel-tank configurations and components are available for applicable projects.

How much does generator rental cost in the UAE?

Indicative UAE rental pricing for a 1,250 kVA generator is approximately AED 35,000 per month, with rates around AED 32,000 per month possible for longer-term projects such as 12+ month rentals. These are indicative averages, excluding fuel, not fixed tariffs. Final pricing depends on project location, client requirements, daily operating hours, rental duration, redundancy, generator configuration, mobilisation, transformers, fuel equipment and storage, and the overall scope of supply. Minimum rental is one month.

Technical content prepared and reviewed by the SINTAQA Engineering Team, Dubai. Last updated September 2026. Configurations shown are indicative; every project is engineered to its own load, site and standards.

Request generator rental in the UAE

Tell us the emirate or site, load and rental period. We will confirm the configuration, mobilisation and price.

By submitting the form, you agree to the privacy policy.
WhatsApp