TEMPORARY POWER PLANTSDUBAI, UAE · ACROSS THE GCC

Temporary Power Plants in the UAE & GCC

A complete rental power station, not a row of generators: synchronised 1,250 kVA modules, standby units, transformers, switchgear, cabling, bulk fuel, commissioning and maintenance, engineered and delivered by one team.

SINTAQA containerised generator and bulk fuel tank operating at night on a project site
SINTAQA / TEMPORARY POWER
Standard module, ≈1 MW each
1,250 kVA
Direct or via step-up transformers
LV · MV
Standby module for continuity
N+1
Equipment yard, Abu Dhabi
KIZAD

What is a temporary power plant?

A temporary power plant is a rented generation system that supplies a site for a defined period: during construction, before a grid connection, during a shutdown, or where there is no grid at all. It combines generators, synchronising controls, distribution, fuel and support into one supply that behaves like a small power station.

  1. Generation1,250 kVA diesel modules
  2. SynchronisationCommon bus, load sharing
  3. ControlPower management, protection
  4. TransformerStep-up to 6.6, 11 or 33 kV
  5. SwitchgearLV and MV, protection relays
  6. CablingSized, routed, terminated
  7. FuelBulk tanks, pumps, lines
  8. CommissioningTested and proven on load
  9. Monitoring & O&MMaintenance for the full term

How does a modular temporary power plant work?

Identical generator modules connect to a common bus through their own breakers. A synchronising controller brings each module to the bus voltage, frequency and phase before closing it on, then shares the load between the running units and starts or stops modules as demand changes. A standby module takes over if one trips.

Modular generator plant3 running generator modules plus 1 standby connected to a common synchronising bus, then a step-up transformer to the medium-voltage network.GG1GG2GG3GStandbySynchronising bus · LVStep-up transformerMV network, e.g. 11 kV
Example architecture: three running modules plus one standby (N+1) on a synchronising bus, stepped up to medium voltage. On Dalma Island, three 1,250 kVA modules feed a 5 MVA step-up transformer.

Details: generator synchronisation, N+1 redundancy and scaling to multi-megawatt plants.

What does SINTAQA supply in a temporary power plant?

The full chain from the generator terminals to your connection point. Every project includes fuel tanks, power cabling, connection, mobilisation and commissioning.

Temporary power plant: scope of supply
PartWhat we supplyNotes
GenerationNew 1,250 kVA containerised diesel generatorsCummins KTA50-G3 engine, Stamford alternator, 50 or 60 Hz
ControlsSynchronising controllers, power managementAutomatic load sharing and unit start/stop
TransformersStep-up transformers where requirede.g. 5 MVA on Dalma Island
SwitchgearLV and MV switchgear, panels and protection relaysSettings from the protection study
CablingPower cables, terminations, routingSized for load and distance
FuelDouble-wall, self-bunded bulk tanks, pumps, linesADNOC-approved tanks; e.g. 68,000 L on Dalma Island
Site worksSurvey, layout, positioning, pad and trench recommendationsIsland and marine logistics included where needed
CommissioningTesting, synchronisation, proving on loadWitnessed by an approved engineer where required
OperationScheduled maintenance, breakdown response, fuel coordinationOn-site operators where needed

Where are temporary power plants used?

Anywhere the load is too large for a single generator or the grid is not available, not yet connected, or out of service.

Applications and SINTAQA references
ApplicationTypical needReference
Island & remote sitesComplete plant with MV step-up and large fuel autonomyDalma Island, AMPC
Marine & barge60 Hz supply, marine installationHudayriat Island, NMDC Energy
Buildings & educationContinuous supply until permanent power is availableSchool in Dubai, Al Shirawi
Oil & gasShutdown and turnaround power, hazardous areasZone 2 generators
ConstructionSite and camp power that grows with the project1,250 kVA modules
Data centresConstruction-phase and commissioning power, redundancyData centre power

How are temporary power plants contracted?

Most plants are rented monthly with a one-month minimum, with lower rates for terms of 12 months or more. For long projects SINTAQA can procure a dedicated fleet in the required rating, and lease-to-own structures are available for certain projects.

Compare rental with ownership in rent or buy for long-term projects, or see indicative rates in the 1 MW rental cost guide.

From site survey to commissioning.
Five clear stages.

01UnderstandLoad, energy source, site and operational requirements.

We start with the real situation on site: continuous and peak load, motor starting currents, voltage and frequency, the connection point, required running hours and the redundancy the operation needs.

We also look at site access, available space, fuel supply, ambient conditions and any hazardous-area classification, as well as the schedule and the rental or contract period.

ResultClear load and site brief

02EngineerGeneration configuration, single-line diagram, protection and layout.

Our engineers size the plant around the load, not the other way round: the number of 1,250 kVA modules, N+1 redundancy, 50 or 60 Hz, LV or MV through step-up transformers.

The proposal includes a single-line diagram, protection settings, cable schedule, fuel tank sizing and a site layout, with a clear commercial offer for the full scope.

ResultConfiguration, SLD and commercial offer

03DeployTransport, positioning, cabling and electrical connection.

Containerised generators, transformers and fuel tanks are mobilised from our equipment yard in KIZAD, Abu Dhabi, by trailer to sites across the UAE, including island and marine locations.

Our team handles offloading and positioning, lays and terminates power cables, installs the fuel system and connects the plant to your switchboard or distribution network.

ResultPlant installed and connected

04CommissionTest, synchronise and bring the system online under load.

Before handover each unit is checked, protection is tested and generators are synchronised to share load on a common bus. The plant is then proven on load, with load bank testing where required.

Where the client or utility requires it, commissioning is witnessed by an approved engineer, and you receive the test records and handover documentation.

ResultPlant online under load

05OperateMaintain, monitor and support the plant throughout the contract.

For the full rental or contract period we carry out scheduled maintenance to engine manufacturer standards, coordinate fuel deliveries and respond to alarms and breakdowns, with on-site operators where needed.

At the end of the term we disconnect, demobilise and remove all equipment, leaving the site clean.

ResultReliable power for the whole contract

Trusted across the UAE.

Rental power and fuel equipment for utilities, government, industrial and oil & gas clients.
01DALMA ISLAND, ABU DHABI

Client AMPC

Island power plant

A complete rental power plant on Dalma Island, offshore Abu Dhabi: generators, step-up transformer, bulk fuel storage and cabling, commissioned by a TAQA-approved engineer.

  • 3 × 1,250 kVA generators
  • 5 MVA transformer
  • 68,000 L fuel storage
  • TAQA-approved commissioning
Read the case study →
02HUDAYRIAT ISLAND, ABU DHABI

Client NMDC Energy

Barge-mounted power, 60 Hz

Two 1,250 kVA generators configured for 60 Hz on a barge that links the construction site on Hudayriat Island to the mainland. Construction traffic crosses the barge, and it swings open to let vessels pass.

  • 2 × 1,250 kVA generators
  • 60 Hz
  • Marine installation
  • Construction
Read the case study →
03DUBAI

Client Al Shirawi

Power supply for a school

Two 1,250 kVA generators keeping a school in Dubai powered, with fuel supply, connection and on-site support.

  • 2 × 1,250 kVA generators
  • Education
  • Continuous supply
04ABU DHABI

Client TAQA Transmission

Fuel storage for transmission sites

Rental diesel storage tanks for TAQA Transmission sites in Abu Dhabi.

  • Self-bunded fuel tanks
  • Utilities

Every project includes fuel tanks, power cabling, connection, mobilisation and commissioning.

Energy & utilities

  • ADNOCAbu Dhabi National Oil Company
  • TAQAAbu Dhabi National Energy Company
  • DEWADubai Electricity & Water Authority
  • Dolphin EnergyGas production & pipeline
  • EmaratEmirates General Petroleum Corporation
  • NMDC EnergyOnshore & offshore EPC

Government & infrastructure

  • Etihad RailUAE national railway
  • RTARoads & Transport Authority, Dubai
  • Dubai MunicipalityGovernment of Dubai
  • KEZADKhalifa Economic Zones Abu Dhabi
  • MiralYas Island destinations

Construction & industry

  • L&TLarsen & Toubro
  • ALECEngineering & contracting
  • TrojanTrojan Construction Group
  • TargetTarget Engineering Construction
  • Al ShirawiAl Shirawi Group
  • Al MasaoodAl Masaood Group
  • Nestlé MENAFood & beverage manufacturing

Temporary power plants: FAQ

What is included in a temporary power plant rental?

Generators, synchronising controls, cabling, bulk fuel tanks and fuel lines, connection to your switchboard, mobilisation and commissioning. Step-up transformers and MV switchgear are added where the load is fed at medium voltage. Maintenance and support run for the full rental term.

How quickly can a temporary power plant be mobilised?

Units in the fleet are containerised and travel by standard trailer from our yard in KIZAD, Abu Dhabi, so mobilisation within the UAE is usually a matter of days. Island, marine and MV connections add time for logistics, transformers and testing; we confirm the programme in the proposal.

Can a temporary plant feed an 11 kV network?

Yes. Generators synchronise on an LV bus and a step-up transformer connects the plant to 11 kV (or 6.6 kV / 33 kV). On Dalma Island three 1,250 kVA modules feed a 5 MVA step-up transformer.

Who commissions the plant?

Our engineers test protection, synchronise the modules and prove the plant on load, with load bank testing where required. Where a utility or client requires witnessed commissioning, it is carried out with an approved engineer; the Dalma Island plant was commissioned by a TAQA-approved engineer.

What information do you need to design a temporary power plant?

Continuous and peak load, largest motor and its starting method, voltage and frequency at the connection point, redundancy target, site location and access, running hours, start date and duration. A load schedule or single-line diagram speeds things up.

Technical content prepared and reviewed by the SINTAQA Engineering Team, Dubai. Last updated September 2026. Configurations shown are indicative; every project is engineered to its own load, site and standards.

Discuss your temporary power requirement

Share the load, voltage, frequency, location and duration, or send a load schedule. Our engineers will propose a configuration and a clear commercial offer.